Follow us
linkedin-logo-png-1825.png

© 2018 CRALEY Group Limited. Registered in England 08475341

  • White LinkedIn Icon
  • White Twitter Icon
  • White Google+ Icon
  • White YouTube Icon

Latest News

Latest News Articles
Featured Posts

August 8, 2018

Sí, más del 95% de las casas tienen un conducto listo para usar que va directamente del exterior de la propiedad a la casa, lo que es perfecto para conectar la casa con banda ancha de fibra real y con el mínimo esfuerzo.

Además, éste conducto hace que sea tan sencillo h...

July 30, 2018

Yes, over 95% of homes have a ready-made conduit running directly from the property to the home, which is perfect for connecting the home to true-fiber broadband with the minimum of fuss.

What's more, this conduit makes it simple to make a 10m (30 ') connection as it wo...

July 25, 2018

Atlantis Hydrotec® pilot home-drop link for Oman BroadBand and SwiftBeam in Muscat, Oman.

During the first week of July 2018, CRALEY Group and Swift Beam, a FTTH network design company, in close collaboration with Oman Broadband, achieved the first FTTH pilot link in Mu...

July 6, 2018

Barlow Robbins - Interview with Chief Executive Officer, Andy Harris. 

As someone who sold his IT distribution business to explore the potential offered by a completely different sector, Andy Harris admits he has always been driven by the excitement of trying something...

July 3, 2018

CTO of CRALEY Group presented Atlantis Hydrotec® and iSM™ in WISA and Isle's TAG conferences. 

CRALEY Group was honoured to have been asked to present at two conferences in Cape Town, South Africa - the WISA (Water Industries of Southern Africa) conference on 26th June...

May 25, 2018

During March 2018, CRALEY Group, Public Utility District No. 1 of Snohomish County (SnoPUD) and IMCO Construction facilitated the installation of a 7km (4.35 mile) 48-fibre Atlantis Hydrotec® link in a hydro-generation tunnel in Washington State, USA.

May 25, 2018

Instalación de 7Km de Atlantis Hydrotec® por debajo de un río  n Snohomish County, Washington State, USA. 

27 de Marzo, 2018. Londres. 

Durante Marzo de 2018, CRALEY Group, Public Utility District No. 1 of Snohomish County (SnoPUD) e IMCO Construction realizaro...

The feed factory Esporc S.A., located in the city of Tona, near Barcelona, ​​is now connected to fiber optics thanks to the collaboration between the Catalan telecommunications operator Emagina (www.emagina.cat) and CRALEY Group.

The problem

Esporc S.A. is an important f...

April 20, 2018

CRALEY Group, recientemente, ha finalizado satisfactoriamente otro primer caso único a nivel mundial. La solución Atlantis Hydrotec® ha sido instalada dentro de una tubería de 500 metros de longitud, con la particularidad que cruza por debajo del río Skagit (Skagit Riv...

April 19, 2018

CRALEY Group has recently successfully achieved another ‘world first’, an Atlantis Hydrotec® Messenger Pipe being delivered across a 500m run in a water pipe running under the Skagit River in Washington State USA for the City of Anacortes.

This link is a part of the 20k...

Please reload

See us at WEFTEC 2019 - Chicago

August 30, 2019

1/10
Please reload

Recent Posts

October 31, 2018

Please reload

Archive